Écorecharge – EV Charging Station Grants
Run by Government of Québec (Ministère de l'Environnement, de la Lutte contre les changements climatiques, de la Faune et des Parcs) · Also called Écorecharge
The Écorecharge – EV Charging Station Grants pay homeowners, landlords and renters up to $5,000 for an individual charger in a multi-unit building.
Up to
$5,000
for an individual charger in a multi-unit building
Verified
You apply on quebec.ca
At a glance
| Maximum amount | $5,000 CAD (2026)$600 (home) / up to $5,000 (multi-unit) |
|---|---|
| Funding type | Rebate |
| Status | Open |
| Who can apply | Homeowners, Renters, Landlords, Businesses |
| Energy assessment required | No |
| Income-tested | No |
| Deadline | March 31, 2028 |
| Where | Québec |
| Level | Provincial |
| Run by | Government of Québec (Ministère de l'Environnement, de la Lutte contre les changements climatiques, de la Faune et des Parcs) |
| Official page | quebec.ca/transports/transport-electrique/aide-financiere-ecorecharge |
| Last verified | |
| Verified by | Rebate Researcher, RebateHub |
| Confidence | HighEvery figure matches the official program pages. |
Écorecharge – EV Charging Station Grants. RebateHub.ca, https://rebatehub.ca/rebates/qc-ecorecharge#key-facts. Last verified October 12, 2026. Official source: https://www.quebec.ca/transports/transport-electrique/aide-financiere-ecorecharge
What you can get
| Upgrade | What you get | Up to |
|---|---|---|
| Home Level 2 charger (house or duplex)$600Purchase, or lease of 36 months or more. Connected charger from the eligible list if acquired after 2026-04-01. At least $600 spent before tax. One charger per eligible vehicle. | $600 | $600 |
| Individual charger in a multi-unit building$600 + 50% of installation, up to $5,000Buildings of 3+ units with shared parking. The installation portion isn't available in newer buildings already wired for chargers (3–4 units built after 2018-10-01, or 5+ units built under the current electrical code) or where the building got an infrastructure grant. | $600 + 50% of installation, up to $5,000 | $5,000 |
| Multi-unit building projects (owners, managers, condo syndicates)Studies 75% up to $5,000; infrastructure 50% up to $120,000; shared chargers $600 eachInfrastructure projects must make at least 50% of residents' parking spaces ready for charging. | Studies 75% up to $5,000; infrastructure 50% up to $120,000; shared chargers $600 each | Varies |
How it works
Écorecharge took over Québec's charging-station grants from Roulez vert on March 17, 2026, and runs until March 31, 2028. EV owners who buy, or lease for at least 36 months, a Level 2 charger for a house or duplex receive a flat $600. You must already own a battery-electric vehicle, plug-in hybrid or electric motorcycle registered in Québec when you apply, and the charger must cost at least $600 before tax. Installation costs are not covered for home chargers. Chargers acquired since April 1, 2026 must be connected (smart) models on the program's eligible list.
Residents of buildings with 3 or more units and shared parking can receive $600 for the charger plus 50% of installation costs, up to $5,000 in total, if the building's electrical system has not already been upgraded with program funding. Separate streams fund building owners and condo syndicates for charging studies (75% up to $5,000 per building), electrical infrastructure upgrades (50% up to $120,000 per building) and shared chargers, as well as workplace and organization chargers.
Who qualifies
- Applicant has bought or leased and registered in Québec a battery-electric vehicle, plug-in hybrid or electric motorcycle, and still has it when applying
- Home stream: building of 1 or 2 dwellings in Québec, used mainly as a residence, where the applicant lives
- Level 2 charger acquired after April 1, 2026 must be a connected model on the Écorecharge eligible list
- Charger purchase or lease cost of at least $600 before tax; leases must be 36 months or longer
- Proof of installation required (installation invoice, or photos if the outlet already existed). Installation must follow Québec's building and electrical rules; use a licensed electrician.
- Chargers bought during the Roulez vert suspension (2025-02-01 to 2025-03-31) are ineligible
How to apply
Step 1: Pick a charger from the Écorecharge eligible list.
Step 2: Have it installed by a licensed electrician and keep the invoice and proof of installation.
Step 3: Apply online through the Écorecharge online services on Québec.ca.
Get quotes from Québec installers
Free, no obligation. We pass your request to up to 3 independent installers who serve your area and, where a program requires it, are registered with it.
- 1. Your project
- 2. Your contact details
- Installers checked against your program’s contractor list, where it has one
- Installers pay us, never you
- Sent to up to 3 installers who serve your area. We don't sell or rent lists.
Stacks with Écorecharge
The program says these can be combined with it for the same home. Check each one’s rules for the same upgrade before you count on both.
- Last verified October 19, 2026OpenProvincialQuébec
Roulez vert – Electric Vehicle Rebate
Québec's EV purchase and lease rebate is in its last year: up to $2,000 for a new battery-electric vehicle and $1,000 for a used one registered in 2026. The program ends December 31, 2026.
$2,000
max discount
Instant discount
Also worth checking
- Last verified October 12, 2026OpenMunicipalRepentigny
Programme d'aide financière à la transition écocitoyenne – EV Charger and Window Glass Grants
Repentigny residents can get $150 for a home Level 2 EV charger installed by a licensed electrician. Owners can get up to $75 per certified sealed glass unit replaced in existing windows, up to $450.
$450
max rebate
Rebate - Last verified October 19, 2026OpenMunicipalBoucherville
Bornes de recharge électrique à usage domestique – Home EV Charger Grant
Boucherville residents can get $150 toward buying and installing a home EV charger, on top of the provincial home charger grant. The charger must be installed by December 31, 2026.
$150
max rebate
Rebate - Last verified October 12, 2026OpenMunicipalTerrebonne
Subvention pour bornes de recharge résidentielles – Home EV Charger Rebate
Terrebonne property owners can get up to $100 toward a home EV charger after the provincial grant, or up to $100 toward installing a charger they already have.
$100
max rebate
Rebate - Last verified October 12, 2026OpenMunicipalJoliette
Programme d'aides financières pour la transition écologique – Low-Carbon Heating and EV Charger Grants
Joliette tops up provincial and Hydro-Québec heating grants, including $500 per dwelling for a heat storage system for Hydro-Joliette customers. It also pays 25% of a home EV charger, up to $250 per connector.
Varies
Grant
Sources
Other sources we checked
- quebec.ca/transport-electrique/aide-financiere-recharge/borne-domicile
- quebec.ca/transport-electrique/aide-financiere-recharge/borne-domicile/choisir-borne-residentielle
- quebec.ca/transports/transport-electrique/aide-financiere-ecorecharge/borne-individuelle-multilogement
- cdn-contenu.quebec.ca/cdn-contenu/environnement/transition-energetique/transport-ecorecharge/cadre-normatif-ecorecharge.pdf